home *** CD-ROM | disk | FTP | other *** search
- Using the custom cable and modified power lead supplied with the
- {bold}Kickstart Ateo Installation Kit{nobold}, connect up the Power Tower LED
- interface to the motherboard following the wiring diagram supplied
- with the kit. This ensures that the activity lights on the front of
- the tower work correctly.
- {p} {p}
- {center}{image gfx/Ateo-Pic-13.iff}{left}
- {p} {p}
- The hardware installation is now complete, check all connections once
- more and the power up your tower. It should boot as normal and behave
- exactly as it did before.
- {p} {p}
- {p} {p}
- {link fe7.8}Turn Page{end}
- {p} {p}